Operationalize Lesson 2.2: Activity Design Quality Checklist

Quality Checklist

Confirm your designs are ready to implement.

Activity Quality Checklist Decision Flow

Six checks decide readiness.

flowchart TB
    START["Activity Design<br/>Complete"]:::gray

    CHECK1{"Does activity build on<br/>existing community assets?"}:::gold
    REVISE1["<strong>REVISE:</strong><br/>Identify and integrate<br/>community assets"]:::red

    CHECK2{"Does activity respect<br/>community values, timing,<br/>protocols?"}:::gold
    REVISE2["<strong>REVISE:</strong><br/>Adjust for<br/>cultural fit"]:::red

    CHECK3{"Are appropriate stakeholders<br/>engaged at right<br/>partnership level?"}:::gold
    REVISE3["<strong>REVISE:</strong><br/>Review power-interest grid,<br/>adjust engagement"]:::red

    CHECK4{"Is capacity transfer and<br/>local ownership<br/>designed in?"}:::gold
    REVISE4["<strong>REVISE:</strong><br/>Add sustainability<br/>elements"]:::red

    CHECK5{"Are resource requirements<br/>feasible and sustainable?"}:::gold
    REVISE5["<strong>REVISE:</strong><br/>Adjust scope or mobilize<br/>additional resources"]:::red

    CHECK6{"Does activity clearly<br/>connect to Logframe<br/>outputs/outcomes?"}:::gold
    REVISE6["<strong>REVISE:</strong><br/>Clarify ToC logic and<br/>Logframe alignment"]:::red

    APPROVED["<strong>APPROVED:</strong><br/>Ready for Implementation"]:::green

    START --> CHECK1
    CHECK1 -->|YES| CHECK2
    CHECK1 -.->|NO| REVISE1
    REVISE1 -.-> START

    CHECK2 -->|YES| CHECK3
    CHECK2 -.->|NO| REVISE2
    REVISE2 -.-> START

    CHECK3 -->|YES| CHECK4
    CHECK3 -.->|NO| REVISE3
    REVISE3 -.-> START

    CHECK4 -->|YES| CHECK5
    CHECK4 -.->|NO| REVISE4
    REVISE4 -.-> START

    CHECK5 -->|YES| CHECK6
    CHECK5 -.->|NO| REVISE5
    REVISE5 -.-> START

    CHECK6 -->|YES| APPROVED
    CHECK6 -.->|NO| REVISE6
    REVISE6 -.-> START

    classDef green fill:#10B981,stroke:#059669,color:#FFF
    classDef gold fill:#F59E0B,stroke:#D97706,color:#000
    classDef gray fill:#6B7280,stroke:#4B5563,color:#FFF
    classDef red fill:#E12729,stroke:#B91C1C,color:#FFF

Four Quality Dimensions

Dimension 1: Foundation Integration (5 criteria)

Score: /5

Dimension 2: Community-Centeredness (5 criteria)

Score: /5

Dimension 3: Implementation Readiness (5 criteria)

Score: /5

Dimension 4: Adaptive Capacity (5 criteria)

Score: /5

Overall Quality Assessment

Your Activity Design Quality Score

/ 20 criteria met

Quality Level:

Strong (18-20)

Proceed to proposal writing.

Developing (14-17)

Strengthen unchecked criteria first.

Needs Strengthening (10-13)

Schedule validation first.

Requires Revision (< 10)

Revisit Module 1 work.

Common Activity Design Pitfalls

Asset Blindness

Ignoring community strengths, building parallel systems.

Cultural Insensitivity

Imposing outside approaches without adapting to local context.

Partnership Extractivism

Treating community as a data source, not a partner.

Implementation Disconnect

Rigid plans that ignore feedback and early warning signs.

Using This Checklist Throughout Implementation

Use it before, during, and after implementation.

Lesson 2.2: Activity Design 82%
Step 9 of 11 · Quality Checklist